23 May 2007
The Inter-American Development Bank announces the results of the environmental and social audit of Camisea project, together with the analysis of the pipelines integrity.
IDB has published the results of the Social and Environmental audit of the Camisea project, carried by IFC International, together with an analysis of the pipelines integrity, which was prepared by Exponent, Inc. Also in the last link you will find the response of E-Tech to the analysis of integrity prepared by Exponent. These topics will be amongst the topics of the 4th of June meeting between the IDB and civil society.
Resources:
BID divulga resultados de una auditoria social y ambiental y un análisis de la consistencia de los ductos del Proyecto Camisea en el Perú, May 17, 2007 (IDB website)
E-Tech response to Exponent (IDB contractor) analysis of Camisea pipeline integrity, May 20, 2007 (E-Tech International website)